Villa Painting Services in Dubai
Exterior & Interior — Professional, Durable, and Hassle-Free
Give your villa a fresh, elegant look that lasts in Dubai’s heat and humidity. Our villa painting services in Dubai cover complete interior and exterior works with premium materials, spotless protection, and a proven step-by-step process.
Why Choose Us for Your Villa
-
Experienced villa specialists: interiors, façades, pergolas, gates, boundary walls
-
Heat-, UV-, and humidity-resistant paint systems tailored for Dubai’s climate
-
Clean, careful work: full masking, floor and furniture protection, daily site cleanup
-
Clear timelines, written scope, and workmanship warranty
Interior Villa Painting — Step by Step
1) Site Visit & Fixed Quote
We inspect rooms, ceiling height, existing coatings, hairline cracks, and damp spots. You receive a clear scope (areas, coats, brand/spec, timeline).
2) Color & Finish Consultation
We help you choose a palette that fits your style and lighting:
-
Finishes: Matt (elegant, low sheen), Eggshell (washable), Satin (high-traffic), Semi-gloss (doors/trim).
-
Specials: Accent walls, decorative textures, kids’ rooms, low-VOC options.
3) Protection & Preparation
-
Cover floors, stairs, cabinetry, and fixtures with plastic sheets and drop cloths.
-
Mask edges, skirtings, sockets, and door hardware with professional tape.
-
Remove or neatly stack lightweight furniture; wrap heavy pieces.
4) Surface Repairs
-
Scrape loose paint, sand uneven areas, de-gloss old enamel where needed.
-
Fill cracks/holes with high-grade filler; re-tape joints if required.
-
Spot-prime repairs and any stained or alkaline surfaces (bathrooms/kitchens).
5) Priming
-
Apply alkali-resistant primer on new plaster or where efflorescence is suspected.
-
Use stain-blocking primer on water marks, smoke, or marker stains.
6) Ceilings First
-
Two uniform coats for a bright, shadow-free ceiling.
-
Mold-resistant systems for bathrooms and kitchens.
7) Walls
-
Two finish coats applied “wet-edge” to avoid lap marks; check for coverage at corners and behind radiators/AC covers.
-
Accent walls painted last for crisp contrast.
8) Wood & Metal (Interior)
-
Sand, dust-off, primer (wood sealer or anti-corrosive for metal), then 2 finish coats in satin/semi-gloss for durability.
9) Quality Checks
-
Raking-light inspection for roller lines and pinholes.
-
Touch-ups logged on a punch list and completed before cleanup.
10) Cleanup & Handover
-
Remove masking, re-fit plates & hardware, reinstall curtains/blinds if requested.
-
Final walkthrough with you; provide care tips and leftover labeled paint for future touch-ups.
Typical Interior Timelines:
-
3–4 BR occupied villa: 2–5 days depending on scope and drying conditions.
-
Add 1–2 days for extensive repairs or decorative finishes.
Exterior Villa Painting — Step by Step
1) Exterior Survey
We assess hairline/map cracks, chalking, sun fade, water ingress, and substrate type (plaster, render, stone, blockwork). We also review access, scaffolding, and safety.
2) Washing & Decontamination
-
Pressure wash façades, parapets, and boundary walls to remove dust and chalking.
-
Treat mildew/algae where present; allow proper dry-down.
3) Repairs & Sealing
-
Open and fill cracks with flexible exterior filler; route larger cracks if needed.
-
Seal expansion joints with UV-stable polyurethane sealant.
-
Patch hollow plaster/render and feather edges smooth.
4) Surface Conditioning
-
Sand glossy or powdery areas; apply bonding/alkali-resistant primer for firm adhesion and salt protection—critical in coastal or high-humidity zones.
5) System Selection (Dubai Climate)
-
Elastomeric wall coatings for hairline crack-bridging and UV resistance.
-
Heat-reflective/UV-stable topcoats to reduce surface temperature and color fade.
-
Anti-fungal additives for shaded or moisture-prone elevations.
6) Application
-
Spray/roll first coat; back-roll to ensure penetration and even film build.
-
Respect drying intervals; apply the second coat for full color depth and durability.
-
Edges, soffits, and cornices cut clean; ensure consistent sheen across elevations.
7) Metals, Woods, & Details
-
Gates/railings: Rust removal, anti-corrosive primer, 2 finish coats.
-
Pergolas/doors: Sand, exterior wood primer, stain or UV-resistant varnish/paint.
-
Boundary walls/caps: Waterproofing top where water sits; drip-edge checks.
8) Final Inspection & Cleanup
-
Inspect under daylight and evening lighting.
-
Remove debris, wash paths/driveways, and demobilize access equipment.
Typical Exterior Timelines:
-
Average villa shell + boundary walls: 3–7 days depending on access, weather, and repairs.